A turnkey line is a two-year relationship before it is a machine. We take responsibility for the full scope: layout, machines, automation, software, foundations, installation and the service contract after.

Book a production audit
How we work

Six steps from first visit to first part

Investments of this size take time, and they should. Every step ends with something you can check, sign off or walk away from.

  1. 0101

    Production audit

    We spend a day on your floor. Parts, volumes, bottlenecks, who runs what.

  2. 0202

    Layout & business case

    A hall layout and a payback calculation your CFO can check line by line.

  3. 0303

    Test runs on your parts

    Bring your drawings or your steel to our showroom. You see the result before you sign.

  4. 0404

    Financing & lease

    Purchase, lease or trade-in of your current machines. We arrange it with our partner banks.

  5. 0505

    Installation

    Foundations, rigging, power, commissioning. Planned around your production, not ours.

  6. 0606

    Service for the long run

    38 service engineers, parts from stock in Andrézieux and a 24h hotline.

Typical timeline: 6 to 18 months from audit to production, depending on scope and foundations.

Projects from €250k to €4M

References

Recent turnkey projects

Agri Rhône Systèmes · Villefranche-sur-Saône, FR

Lights-out laser line with tower storage

Two 12 kW lasers, a 14-shelf material tower and automatic part sorting. The night shift now runs without operators.

€3.2M
Investment
14 months
First visit to production
+62%
Extra capacity

Veltmann Automotive · Aachen, DE

Robotic welding hall for a tier-1 supplier

Six dual-station welding cells with shared fixtures and one programming office. Commissioned during the summer stop, zero lost production days.

€1.8M
Investment
6
Cells
3 weeks
Installation window

Éolia Structures · Saint-Nazaire, FR

Plate rolling and welding line for tower sections

A 4-roll machine for 60 mm plate, a longitudinal seam welder and turning rolls, specified around the client’s crane capacity and hall layout.

€2.4M
Investment
60 mm
Max. plate
9 months
Lead time

Planning your next investment?

Big machines are long decisions. Start with a production audit: one day on your floor, a layout and a business case, no commitment.